Showing posts with label Pile Driving Equipment. Show all posts
Showing posts with label Pile Driving Equipment. Show all posts

Saturday, 23 February 2013

Pile Driving Equipment




Depending on the existing capacity of the equipment, the geological conditions of the construction, the designing regulations on piling depth and maximum allowed depth, the Contractor can choose suitable pile method. Principles for selecting hammer as follows:
• Enough capacity to put the pile down to designing depth with the maximum allowed depth as specified in designed document, through the thick soil layer even the hard cladding layer;
• Causing the dynamic press not over the allowed press of pile to limit the risk of cracking pile
• Total of hammering times or total time of pile leading is not over the limiting value in the design to prevent the risk of tired pile;
• The maximum allowed depth of pile is not too tiny can caused