Depending on the existing capacity of the
equipment, the geological conditions of the construction, the designing
regulations on piling depth and maximum allowed depth, the Contractor can
choose suitable pile method. Principles for selecting hammer as follows:
• Enough capacity to put the pile down to
designing depth with the maximum allowed depth as specified in designed
document, through the thick soil layer even the hard cladding layer;
• Causing the dynamic press not over the
allowed press of pile to limit the risk of cracking pile
• Total of hammering times or total time of
pile leading is not over the limiting value in the design to prevent the risk
of tired pile;
• The maximum allowed depth of pile is not too
tiny can caused
to damage of hammer head.
HAMMER
It
is general practice to use steam hammer, air harmer, water pressure hammer or
diesel hammer. Diesel hammer of closed type ram shall be of standard capacity and
device measuring its output capacity shall be attached to the hammer.
PILE CUSHION The slots between the side face and the cushion of the pile is not over 1 cm each. A suitable pile cushion of adequate thickness, preferably greater than 10 cm, shall be provided between the cap and pile top. The pile cushioning material shall be replaced before the thickness of hammer cushion is compressed by 50% of the original thickness
LEADS
• Piles shall be supported in alignment and
position with leads while being driven
• Leads shall be designed and constructed to
afford freedom of movement of the hammer and to permit proper placing of batter
piles.
• Leads shall preferably be of sufficient
length to be firmly supported on the ground space.
FOLLOWERS
• The driving of piling with followers shall
be done only under written permission from the Engineer.
• When followers are used, and if deemed
necessary by the Engineer, one pile from each group of 10 (ten) shall be a long
pile driven with a follower, and shall be used as a test pile to determine the
average load capacity of the group.
PILE PRESSING
Selecting the piling equipment need to satisfy
the following requirements:
• The capacity of equipment is not less than
1.4 time of the biggest pressing force as regulated in the design
• The pressing force of the equipment must
ensure right effect on the pile coax central vertical when driving pile from
top and regular distributing on the side face of pile when embedding, not
caused horizontal force on the pile.
• The equipment must obtain the inspection
certificate for dead-time on the pressure gauge and oil valves together with
the calibration adjustment issued by the authorize organization
• Piling equipment must ensure for safety
running condition and safety labor when operating.
Selecting reaction system for piling work
depending much on the features of the Site, characteristics of the
construction, geology as well as capacity of piling equipment. It is possible
to create the reaction system by tightly twisting anchorage underground or
arranging load by heavy items on the ground in pre-piling or the anchorages
available in the construction foundation in order to use the construction
weight as the reaction system in the post-piling method. In all cases, the
total weight of the reactions system should not be less than 1.1 times of the
biggest pressing force as specified in the design.