Generally, the contractor shall allow
for all necessary measures to monitor and avoid cracking in fresh
hydrating concrete, regardless the size or volume of the pour. Such
measures shall be to the satisfaction of the Engineer and shall be such
that maximum surface crack width on hardened concrete measure
immediately after the pour does not exceed 0.004 times the nominal cover
of the main reinforcement.
The contractor shall allow for and
provide approved instrumentation for the measurement of internal
temperature changes in large pours. The maximum concrete temperature at
the point of delivery shall not in general exceed the lower of either 37
degree C, or 6 degree C above the prevailing shade temperature in
accordance with the recommendations of ACI. The limiting internal
temperature differential measured across the extreme faces of concrete
mass shall not exceed 25 degrees C at any time.
Curing of hardened concrete shall be
executed in accordance with the curing specification. Generally, the
element surface shall not be cooled to dissipate heat from the concrete.
Curing methods, such as the wetting of heated concrete elements exposed
to prolonged and direct radiation, which induce temperature gradients
within the concrete mass are strictly prohibited.
For large pours, the contractor shall
allow for and take extra precautions to reduce concrete temperature
gradient and to prevent the loss of surface moisture. Such measures
include but are not limited to:
- Keeping all mix constituents shaded where possible to reduce their temperatures in the stockpile
- Cooling of mixing water and/or replacing part or whole of the added water with ice.
- Reducing the cement content by the use of admixtures (but not below that required for the durability)
- Using a cement with a lower heat of hydration
- Injecting liquid nitrogen after mixing of concrete
- Restring the time between mixing and placing of the concrete to not more than 2 hours
- Providing approved surface insulation continuously over all exposed surfaces to prevent draughts and to maintain uniform temperature through the concrete mass
- Initiating curing immediately after final tamping and continue until the approved surface insulation system is fully in place
- Providing shade to the concrete surface to prevent heat gain from direct radiation.
If the surface exhibits crack after
compaction, it shall be retamped to close the cracks while the concrete
is still in plastic stage.